Monday, 19 March 2012

'The Parts Arrive'...

After much anticipation my parts from the Middle-East have arrived this morning!
Only 1 slight problem...Where's the bloody fork-lift truck???
The assignment has been packed and delivered on a truck that is too small and has no fork-lift for unloading.
They have been sent to a temporary storage facility and will be offloaded and reloaded onto a bigger truck that has fork-lift capabilities. I should expect them tomorrow.
So what you see in the photo is only half of the shipment, all packed in double-width boxes and loaded from the rear. Even if there was a fork-lift they wouldn't have been able to offload from the side anyway!
I feel a breakdown in communication has happened somewhere along the line!

3 comments:

  1. I could really use one of those bulk heads!

    ReplyDelete
  2. They are NOS Series 2a bulkheads. I will post all the photos tomorrow hopefully! :D

    ReplyDelete
  3. Hopefully plenty of bits for SEB and Siegfried!

    ReplyDelete